Got some odds and ends done this week while we wait for springs and shocks to show up. Sheet metal cover for the tunnel was completed (with insulation), as was the under-dash firewall and tidying up of wiring. Coolant system overflow tube was fabbed and installed. The engine was run for about 30-minutes in the Arizona heat with no overheating. Hopefully, suspension pieces show up soon so we can get her back into a drivable state.
No comments:
Post a Comment